List of Executive Summaries

Sl. No.

Name of Deposit

Extent

Nature of Investigations

Cost of Executive Summaries (Rs.)

I. Andhra Pradesh

1

Barua – Donkuru

25 x 0.5 km

Detailed

22,500

2

Bendicreek – Barua

27 x 1.5 km

Reconnaissance

9,800

3

Bhavanapadu –Hukumpeta

25 x 0.4.8 km

Reconnaissance

9,800

4

Kalingapatnam

27 x 1.5 km

Reconnaissance

9,800

5

Srikakulam

22 x 0.7 km

Reconnaissance

9,800

6

Konda – Mukkampeta

32 x 2 km

Reconnaissance

9,800

7

Kakinada (Phase - I to VII)

32 x 2 km (Total)

Detailed

22,500

(each sector)

II. Tamil Nadu
 

Beach Areas

     

1

Vattakottai – Kuttapuli

62.67 Hectares

Semi detailed

22,500

2

Kudamkulam–Parumanal-Panjel

16.00 Hectares

Semi detailed

11,500

3

Navaladi-Ovari-Athangarai

217.00 Hectares

Semi detailed

22,500

4

Ovari-Tiruchendur

741.00 Hectares

Reconnaissance

22,500

5

Vembar-Naripaiyur

700.00 Hectares

Reconnaissance

22,500

6

Nagaore-Karaikal Tranquibar

427.00 Hectares

Reconnaissance

22,500

         
 
Along Inland Teris
     

1

Teris of Kanyakumari:

   

 

Kanyakumari-Vattakottai

2.52

Semi detailed

22,500
 

Mahadhanapuram

3.80

Semi detailed

 

Muttam

7.60

Semi detailed

 

Perumalpuram

0.53

Semi detailed

         

2

Idinkara-Vijayapati

98.37

Semi detailed

22,500

3

Navaladi-Kuttapanai-Periathalai

5811.37

Semi detailed

75,000

4

Sattankulam

1948.30

Semi detailed

40,000

5

Surangudi-Sevalpatti

1590.00

Semi detailed

35,000

6

Kuttampuli-Naduvakurichi

1060.00

Semi detailed

22,500

7

Kulathur-Memandai

1076.00

Semi detailed

22,500

8

Kilakarai-Eravadi

821.00

Semi detailed

22,500

         

III. Orissa

1

Rushikulya-Bajarkot

23 x 0.8 km

Reconnaissance

9,800

2

Bajarkot-Puri

65 x 0.6 km

Reconnaissance

9,800

         

IV. Maharashtra

1

Ratnagiri

25 x 0.5 km

Semi detailed

18,760

    *  Semi detailed  : 200 m x 50 m / 200 x 100 m Grid

        Reconnaissance : 500 m x 200 m / 3000 x 200 m Grid

Go Back